Friday, 8 January 2016

3 weeks and counting

We've had the house for three weeks.  seems like a lot longer.  I'm still having a bit of trouble writing, I'm best staying busy. so - photos of whats been happening is probably best.


Putting the kitchen together.  cabinets are put together, just prepping and fitting out the cabinet doors.


 Stripping up MDF to accent the doors.  attached and undercoated ready for enamel tomorrow.


Windows are prepped and undercoated ready for enamel.  Pantry doors and main door stripped up with MDF, bogged and sanded, this is pre undercoat (now done) ready for enamel.


wainscotting all undercoated.  the change is DRAMATIC.  All that hard work and its looking legit amazing.



The sprayer has been such a huge time saver.  ceilings all have two coats of ceiling flat.  lifts the whole room! amazing. I'm so happy with it.

Tomorrow will enamel the wainscotting, the windows in the kitchen.  have prepped the exterior windows at the front of the house today, so they will be a sand and paint tomorrow hopefully - weather depending!

No comments:

Post a Comment